How Much Testing Is Enough?

  • It is possible to do enough testing but determining the how much is enough is difficult. Simply doing what is planned is not sufficient since it leaves the question as to how much should be planned.
  • What is enough testing can only be confirmed by assessing the results of testing. If lots of faults are found with a set of planned tests it is likely that more tests will be required to assure that the required level of software quality is achieved.
  • On the other hand, if very few faults are found with the planned set of tests, then (providing the planned tests can be confirmed as being of good quality) no more tests will be required.
  • Saying that enough testing is done when the customers or end-users are happy is a bit late, even though it is a good measure of the success of testing. However, this may not be the best test stopping criteria to use if you have very demanding end-users who are never happy!
  • Why not stop testing when you have proved that the system works? It is not possible to prove that a system works without exhaustive testing (which is totally impractical for real systems).
  • Have you tested enough when you are confident that the system works correctly? This may be a reasonable test stopping criterion, but we need to understand how well justified that confidence is. It is easy to give yourself false confidence in the quality of a system if you do not do good testing.
  • It is not uncommon to have one Master Test Plan which is a common document for the test phases and each test phase have their own Test Plan documents.
  • Ultimately, the answer to “How much testing is enough?” is “It depends!” (this was first pointed out by Bill Hetzel in his book “The Complete Guide to Software Testing”). It depends on risk, the risk of missing faults, of incurring high failure costs, of losing creditability and market share. All of these suggest that more testing is better. However, it also depends on the risk of missing a market window and the risk of over-testing (doing ineffective testing) which suggest that less testing may be better.
  • We should use risk to determine where to place the emphasis when testing by prioritizing our test cases. Different criteria can be used to prioritize testing including complexity, criticality, visibility and reliability.

Comments

Popular posts from this blog

Mobile Application Testing Checklist

1. DEVICE SPECIFIC CHECKS 1.1  Can the app be installed on the device? 1.2 Does the app behave as designed/desired if there is an incoming call? 1.3 Does the app behave as designed/desired if there is an incoming SMS? 1.4 Does the app behave as designed/desired if the charger is connected? 1.5 Does the app behave as designed/desired if the charger is disconnected? 1.6 Does the app behave as designed/desired if the device goes to sleeping mode 1.7 Does the app behave as designed/desired if the device resumes from sleeping mode 1.8  Does the app behave as designed/desired if the device resumes from lock screen? 1.9    Does the app behave as designed/desired if the device is tilted? 1.10  Does the app behave as designed/desired if the device is shaken? 1.11 Does the app behave as designed/desired if a local message is coming from another app (think   of: calendar reminders, to-do task etc.). 1.12 Does the app behave as designed/desired if a push message i...

ERP Domain Knowledge

What is ERP ? ERP is an industry acronym for Enterprise Resource Planning. Broadly speaking, ERP refers to automation and integration of a company's core business to help them focus on effectiveness & simplified success.The Information Technology industry is renowned for its adoption of acronyms, which are often widely used, but not fully understood.  The term 'ERP' itself is not self-explanatory and refers to the business software that has been designed to record and manage your enterprise data. Main Purpose of ERP: The main objective of an ERP domain is to combine information and processes from all divisions of an organization and merge them to create a structured working system. It can either reside on a centrally placed server or on individual servers that are combined on a separate server. Use of ERP: ERP specifically describes software that is used to connect many aspects of a business together. One major use for ERP software is controlling a supply chain. Busine...

Test Scenarios for Excel Export Functionality

1. The file should get exported in the proper file extension. 2. The file name for the exported Excel file should be as per the standards e.g. if the file name is using the timestamp, it should get replaced properly with an actual timestamp at the time of exporting the file. 3. Check for date format if exported Excel file contains the date columns. 4. Check number formatting for numeric or currency values. Formatting should be the same as shown on the page. 5. The exported file should have columns with proper column names. 6. Default page sorting should be carried in the exported file as well. 7. Excel file data should be formatted properly with header and footer text, date, page numbers etc. values for all pages. 8. Check if the data displayed on a page and exported Excel file is the same. 9. Check export functionality when pagination is enabled. 10. Check if export button is showing proper icon according to the exported file type E.g . Excel file icon for xls files 11. ...